+57 311 244 5992 protected email Tunja, Boyacá · Nationwide
Colombia's National Natural Parks · 2024–2025

Gorgona NNP

Pacific Ocean island · Cauca

Construction photos · 17 photos
After: house 15 with the exterior finished, white walls, orange base trim and a new roof on a timber structure · Poblado sector maintenance, Gorgona NNP · MARA Ltda
Gorgona NNP · photo 2 of 17
Gorgona NNP · photo 3 of 17
Gorgona NNP · photo 4 of 17
Gorgona NNP · photo 5 of 17
Before: house 15 in the Poblado sector when work began, with faded walls and the old fiber-cement roof · Poblado sector maintenance, Gorgona NNP · MARA Ltda
Before: the gable end of the staff block with peeling paint and the old doors, under the new roof already in place · Poblado sector maintenance, Gorgona NNP · MARA Ltda
After: the staff block from the same corner, with a white facade, timber windows and a veranda all around · Poblado sector maintenance, Gorgona NNP · MARA Ltda
Finished interior of house 14: white walls with wall lights, timber beams under the ceiling and a tiled floor · Poblado sector maintenance, Gorgona NNP · MARA Ltda
New gate valve on the water main of the water supply system, inside the forest · Poblado sector maintenance, Gorgona NNP · MARA Ltda
On-site assembly of the steel frame for an elevated crossing of the water main, beside the stream · Poblado sector maintenance, Gorgona NNP · MARA Ltda
Steel portal frame of an elevated crossing on its concrete footings, with the water main at its base · Poblado sector maintenance, Gorgona NNP · MARA Ltda
Completed elevated crossing: steel portal frame on the stream boulders and the water main crossing over it · Poblado sector maintenance, Gorgona NNP · MARA Ltda
Portal frame of a suspended crossing with its anchor cables; the water main is hung across the stream · Poblado sector maintenance, Gorgona NNP · MARA Ltda
High-density polyethylene water main laid along the forest trail · Poblado sector maintenance, Gorgona NNP · MARA Ltda
New gate valves on the water supply network where the main reaches a building of the water system · Poblado sector maintenance, Gorgona NNP · MARA Ltda
New concrete valve box on the water supply network, with the main running through it · Poblado sector maintenance, Gorgona NNP · MARA Ltda

After: house 15 with the exterior finished, white walls, orange base trim and a new roof on a timber structure

01 · What was built

Maintenance and upgrading of the Poblado sector.

Between July 2024 and March 2025, under a contract with Colombia’s National Natural Parks, MARA carried out the maintenance and upgrading of the island’s Poblado sector: houses 14 and 15, the staff block, the administrative block, the Umantatay B module, the water system and the hydroelectric plant. On the water supply system, MARA laid a new high-density polyethylene main and built elevated crossings on steel frames, some of them hung from steel cables, to span streams and unstable stretches of the hillside. The photos run from the initial state, in August 2024, to the final finishes, in April 2025.

02 · Where

A Pacific island reachable only by sea.

Gorgona lies in the Colombian Pacific, about 35 km off the coast of Cauca, reached by boat from Guapi or Buenaventura. It is tropical rainforest on an island: rain most of the year, high humidity and constant salinity.

03 · The challenge

Sea logistics and materials that withstand salt.

Everything, from cement to roof tiles, arrives by boat and is unloaded by hand. Salt and humidity shorten the life of untreated wood and unprotected metal, so materials are chosen for that environment. And the work happens inside a national park, alongside the park staff on the island and under its environmental rules.

04 · MARA’s other works in the park

Three contracts on the island.

2024–2025 · Poblado sector cabins. Between November 2024 and February 2025, in parallel with the maintenance works, MARA upgraded the type 1, 3 and 4 cabins, the Umantatay A module and the researchers’ block.

2026–2027 · Ecotourism infrastructure (in progress). With Patrimonio Natural and funding from FONTUR, Colombia’s National Tourism Fund, we are building the multipurpose center, the Yundigua and Playa Palmeras trails, a viewing tower, traditional market modules, an elevated day-visit deck and boardwalks. This project now has its own page.

05 · The outcome

A Poblado sector ready to operate.

The Poblado sector’s houses, service blocks and water and power networks, ready for the National Parks team and researchers to live and work on the island, and to receive visitors.